91原创

Skip to content

Self-storage facility gets green light from 91原创 City

A new self-storage facility is planned for 56 Avenue, just east of the 91原创 Bypass.

A development permit application for a state-of-the-art, four-storey storage facility at 20986 56 Ave. was passed unanimously by 91原创 City council on Monday, Oct. 21.

AAA Self Storage Depot Inc. will span 50,077 square feet, on the northwest corner of the site that鈥檚 currently being used for parking and long-term vehicle storage.

While the Nicokmekl River is located just 15 metres east of the property, Krahn Engineering Ltd.鈥檚 design manager Darren Cruickshanks assured council that the structure won鈥檛 affect any of the surrounding creeks or rivers, including a tributary originating from a culvert passing under 56 Avenue.

鈥淥ur proposed development is well away from that body,鈥 he said, also noting a Qualified Environmental Professional (QEP) has completed an assessment of the proposed development to comply with the Riparian Area Regulation and determine setbacks from the adjacent watercourse.

Typically, setback requirements between 15 and 30 feet would be enforced for a development in close proximity to the watermark. But with the lot being paved and contained within the asphalt area, the development has been grandfathered to allow development, explained Cruickshanks.

鈥淎ny construction is 15 metres away from the watermark of the creek, meeting or exceeding the grandfathered area regulations.鈥

Cruickshanks also pointed out that the building won鈥檛 disturb any of the native greens 鈥 natural vegetation will be allowed to sprawl right up to the back of the building.

鈥淥ur proposed development doesn鈥檛 plan to take down any vegetation in the area. It鈥檚 all on City land so we can鈥檛 touch it,鈥 he said.

鈥淭here鈥檚 only one tree that鈥檚 in question but that鈥檚 a tree health concern.鈥

And with the proposed structure being four storeys high and in close proximity to the 91原创 Airport, Cruickshanks addressed the concern of possible disruption to flight patterns.

鈥淒espite some old and outdated covenants that were placed on the property to prohibit  construction over a certain height, we have since met with the airport authority and have had that covenant rewritten to permit the construction of this building for a couple of reasons,鈥 he explained.

Several local residents who live within close proximity to the proposed development shared their concerns with council. These ranged from noise pollution and increased air traffic to parking.

Laverne Pringle, a resident of the Riverside townhouse complex in 91原创 City, worries the air traffic, which is right above her building, will increase if the proposed building is approved.

鈥淚t鈥檚 a safety issue, a health issue and it鈥檚 noise pollution, so I hate for this to increase flight traffic,鈥 she said.

Debra Southam, a resident of the River Walk condominium at 20976 56 Ave., told council she is worried about the noise the development will create in the community.

鈥淭here will be some construction noise, but there鈥檚 not a lot we can do about it,鈥 said Cruickshanks, who points out that once the construction is complete, noise will be minimal.

Depending on weather conditions, construction is expected to take between eight and 10 months.

鈥淭his facility is very sound... you won鈥檛 be hearing anything coming out of the building 鈥 it鈥檚 not a storage unit with a loading dock. It鈥檚 residents renting a locker room who come to unload their stuff and go.鈥

as they please.鈥

While the proposed development would provide 29 off-street parking spaces for the entire site, 91原创 City resident Paul Albrecht fears that won鈥檛 be enough.

鈥淚鈥檓 worried about a reduction in parking 鈥  you can鈥檛 measure or predict how long people are going to be there,鈥 he said.

鈥 The amount of parking on 56 Avenue is getting busier and busier all the time and I can see some turns and exit issues that should be addressed.鈥

Cruickshanks pointed out that since the City has no specific parking requirements for mini-storage warehouses, the standard warehouse requirement from the Zoning Bylaw is applicable.

Depending on weather conditions, construction of AAA Self Storage Depot Inc. is expected to take between eight and 10 months.